两个吃我奶一个吃我b,用玉势堵着骑马

English Chinese
Home page About happy Product center news talents wanted Feedback of customer contact us
Amino molding compound A1 series
Melamine A5 Plastic
Composite melamine pellets
High-end environmentally friendly adhesive
Company headquarters: 0537-3863158 3864618 3761111
Company Fax: 0537-3769999
Company website: www.gaoximgmy.com
Headquarters email: jngx999@boardeast.com jngx888@boardeast.com
Address of Company: Wang Yin Street Office, Jining National High-Tech Industrial Development Zone, Shandong, China
news Your current location : Home >> News
Huai'an Happy New Materials Co., Ltd.'s first environmental impact assessment publicity
Huaian Happy New Material Co., Ltd.
Project with an annual output of 50,000 tons of phenolic resin, 30,000 tons of high-performance epoxy resin, and 50,000 tons of unsaturated silicone resin
The first public announcement of environmental impact assessment
According to the "Interim Measures for Public Participation in Environmental Impact Assessment" (SEPA, Huanfa [ 2006 ] No. 28 ) and "Opinions on Effectively Strengthening Public Participation in Environmental Protection of Construction Projects" (Suhuan Regulation [ 2012 ] No. 4 ) (Ecological Environment Decree No. 4 of 2018 ) and other relevant regulations, the first public announcement on the environmental impact assessment of the " project with an annual output of 50,000 tons of phenolic resin, 30,000 tons of high-performance epoxy resin and 50,000 tons of unsaturated silicone resin " .
  I. Project Name and Summary
   1. Project name: 50,000 tons of phenolic resin, 30,000 tons of high performance epoxy resin, 50,000 tons of unsaturated silicone resin project
   2. Construction site: North of Yandu Road, east of Taibo Avenue, Suhuai High-tech Zone, Huaian City, Jiangsu Province
   3. Nature of construction: reconstruction
   4. Project summary:
Huai'an Happy New Materials Co., Ltd.'s environmental impact report with an annual output of 60,000 tons of formaldehyde and 50,000 tons of electric jade powder project (re-approved) was approved by the Huai'an Ecological Environment Bureau on December 20 , 2018 . [ 2018 ] No. 285 . The project has not yet been accepted.
This reconstruction project purchased 271 sets (forms) of formaldehyde pumps, reaction kettles, gear pumps, vacuum pumps, RTO incinerators , etc., and adapted the plant, hydropower and other public works. After the completion of the project, the annual production capacity of 50,000 tons of phenolic resin, 30,000 tons of high-performance epoxy resin, and 50,000 tons of unsaturated silicone resin will be formed . The project should strictly implement the "three simultaneous" principles of environmental protection, safety and fire protection .
  Name and contact information of the construction unit
Construction unit: Huai'an Happy New Material Co., Ltd.
Mailing address: North of Yandu Road, east of Taibo Avenue, Suhuai High-tech Zone, Huaian City, Jiangsu Province
   Contact: Ren Junhui
Phone: 19984981262
  Name and contact information of the environmental impact assessment agency undertaking the evaluation
Name of environmental impact assessment agency undertaking the project: Anfu Bida Environmental Protection Co., Ltd.
   Contact: Zhao Gong
   Phone: 15051359419
   4. Working procedures and main contents of environmental impact assessment
The main working procedures are to investigate and analyze the surrounding environment, and to consult the data, field visits, and consult engineering and technical personnel, etc., to basically grasp the factors related to the project production and environment, and to predict the degree of impact of the project on the surrounding environment through mathematical model calculations And scope, at the same time, propose improvement measures for the project's environmental protection problems, and on this basis, prepare the project's environmental impact report in order to provide scientific decision-making basis for project decision-making and environmental management.
The main evaluation content is based on engineering analysis and pollution source investigation, and takes engineering analysis, atmospheric environmental impact assessment, and pollution prevention measures as the focus of evaluation. It analyzes the links and quantities of pollutants generated during the production process of the project, and proposes a reasonable and economical And feasible pollution control measures, and evaluate their feasibility, so that pollutants can be discharged in compliance with standards, and the impact on the surrounding environment is minimized.
V. Scope and Precautions for Public Comment
    The scope of this public consultation is the public who is concerned about the construction of the project within the scope of its influence.
Six, the main matters of public participation opinions
   1. During the project environmental impact assessment work, you can put forward the project environmental feasibility opinions and requirements to the construction unit and evaluation unit.
   2. During the project environmental impact assessment work, you can put forward suggestions and requirements to improve project environmental protection measures and prevent project pollution.
   3. After the preliminary draft of the project environmental impact report is prepared, the construction unit or evaluation unit will make another announcement.
   4. After compiling a brief project environmental impact report, you can consult the brief report to understand the situation. The construction unit and evaluation unit will provide convenience or answers.
5. The construction unit and evaluation unit will listen to the public's opinions carefully, and carry out the environmental impact assessment of the project scientifically, fairly, justly and legally.
Scope and matters needing attention for public comments
The scope of this public consultation is the public who is concerned about the construction of the project within the scope of its influence.
Ways and means of public comments
After the relevant information is disclosed, the public can submit opinions to the construction unit or its entrusted environmental impact assessment agency and the environmental protection department responsible for examining and approving the environmental impact report by fax, email, or letter.
   Network link of public opinion form
Download of public opinion form for environmental impact assessment: http://pan.baidu.com/s/1jTyyEzhsvAkZ1XFt83qTHQ
X. Start and end time for public comments
The public will put forward your valuable comments within 10 working days from the date of this announcement .
   Huaian Happy New Material Co., Ltd.
January 2 , 2019
Home | About Us | Products | News | Recruitment | Feedback | Contact Us
Copyright @ 2010 All Rights Reserved Shandong Happy New Material Co., Ltd. All rights reserved
Company Headquarters: 0537-3863158 3864618 3761111 Company Fax: 0537-3769999 Company Website: www.gaoximgmy.com Company Address: Wang Yin Street Office, Jining National High-tech Industrial Development Zone, Jining, Shandong, China
Company Alibaba: http://yzgxmy.1688.com/ (Integrity Link) http://gaoxingwood.en.alibaba.com/ (Export Link)
Technical Support: Mizuki Technology-Expert of Website Construction of Enterprise Brand鲁 ICP 备 14009404 号